Matheran Toy Train

The Matheran Hill Railway is a narrow-gauge line that climbs about 21 km from Neral to Matheran. It opened in 1907 and is one of the few mountain railways still running in India.

Two services, and they are not the same

Neral – Matheran

The full journey up the hill, with forest, valley views and dozens of sharp curves. It takes around two and a half hours. Only a few trains run each day and they fill up quickly.

Aman Lodge – Matheran shuttle

A short ride between Aman Lodge (near the Dasturi car park) and Matheran station. It runs more often and is the practical choice if you came by road.

Things that catch visitors out

  • The full Neral–Matheran service is usually suspended during the monsoon for safety. The shuttle generally keeps running.
  • Seats on the Neral trains are limited. Reach the booking window early, especially on weekends and holidays.
  • The train is slow by design. If you are short on time, go up by taxi and use the shuttle.
  • Sit on the valley side for the best views.

Neral – Matheran timetable (daily)

The train stops at Jummapatti, Water Pipe and Aman Lodge. The journey takes about 2 hours 40 minutes.

RouteTrainDepartsArrivesCoaches
Neral → Matheran5210308:50 am11:30 amSecond class + Vistadome
Neral → Matheran5210510:25 am01:05 pmSecond class + First class
Matheran → Neral5210402:45 pm05:30 pmSecond class + Vistadome
Matheran → Neral5210604:00 pm06:40 pmSecond class + First class

Aman Lodge – Matheran shuttle timetable

The ride takes about 18 minutes. Six services run every day, with two extra services on Saturdays and Sundays.

From Aman LodgeFrom MatheranRuns
08:45 am08:20 amDaily
09:35 am09:10 amDaily
10:30 am10:05 amSaturday and Sunday only
12:00 noon11:35 amDaily
01:35 pm01:10 pmSaturday and Sunday only
02:25 pm02:00 pmDaily
03:40 pm03:15 pmDaily
05:45 pm05:20 pmDaily

Tickets

  • Ticket windows at Neral and Aman Lodge open about 45 minutes before each departure. Join the queue early on busy days.
  • Timings can change at short notice for technical reasons. Confirm on IRCTC or NTES before you travel.

Last checked: November 2026. Regular post-monsoon services resumed on 30 October 2026. Always confirm the timetable with Central Railway before you travel.